EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sportsman
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (661)
Rudder (III)
- (1)
Horiz S (IV)
- (11)
Elevator (V)
- (32)
Wing LH (VI)
- (107)
Wing RH (VI)
- (82)
Aileron(VII)
- (38)
Flaps (VII)
- (32)
Fuselage (VIII)
- (67)
Systems (IX)
- (113)
-
Step #115 - Route...
-
Step 102 - route...
-
Step 102 - route...
-
Step 102 - route...
-
Parking Brake option...
-
Step 101 - Route...
-
Step #108 - Route...
-
Step #7 - Install...
-
Step #107 + 108 -...
-
Step #106 - Mount...
-
Step #106 - Mount...
-
Step #105 - Install...
-
Step#104 - Drill...
-
Step #103 -...
-
Step #106 - Mount...
-
Step #103 -...
-
Step 100 - install...
-
Step #99 - Install...
-
Step #86 - Check...
-
Step #85 - mount...
-
Step #84 - Mount...
-
Step #83 - Install...
-
Step #82 - Mount...
-
Step #81 - Mount...
-
Step #80 - mount...
-
Step #79 - Mount the...
-
Step #78 - Mount...
-
Step #76 Mount tubes...
-
Step #75 Install...
-
Step #74 - Install...
-
Step #74 - Install...
-
Step #74 - Install...
-
Step #73 - Drill and...
-
Step #72 - Insert...
-
Step #71 - Support...
-
Install nutserts on...
-
Step #79 - Cut cove...
-
Step #79 - Cut cove...
-
Step #75 - Install...
-
Step #75 - Install...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74 - Rivet...
-
Step #74
-
Step #74 - Rivet...
-
Step #72 - Cleco...
-
Step #70 - Install...
-
Step #69 - Install...
-
Step #70 - Install...
-
Step #61 - Fit the...
-
Step #60 - Install...
-
Step #67 - Drill the...
-
Step #64 - Route...
-
Step #63 - cut...
-
Step #58 - install...
-
Step #56 - Cut hole...
-
Step #59 - Position,...
-
Step #57 - Position...
-
Step #56 - Cut hole...
-
Step #66 - Install...
-
Step #53 - install...
-
Step #55 - Drill...
-
Step #51 - drill...
-
Step #49 - apply...
-
Step #69 - Install...
-
Step #67 - Drill the...
-
Fuel Tank padding
-
Step #66 - Install...
-
Step # 65 - Drill...
-
Step #63 - cut...
-
Step #61 - Fit the...
-
Step #4 - Fabricate...
-
Step #60 - Install...
-
Step #58 - install...
-
Step #57 - Position...
-
Step #59 - Position,...
-
Step #57 - Position...
-
Step #56 - Cut hole...
-
Step #55 - Drill...
-
Step #54 - Make...
-
Step #53 - install...
-
Step #52 - test fit...
-
Step #51 - drill...
-
Step #50 - fit test...
-
Step #49 - apply...
-
Step #25 - Install...
-
Step #25 - Install...
-
Step #24 - Install...
-
Step #24 - Install...
-
Step #23 - Install...
-
Step #22 - Fabricate...
-
Step #21 - Complete...
-
Step #20 - Install...
-
Step #19 - Install...
-
Step #18 - Fab and...
-
Step #18 - Fab and...
-
Step #13 - 17...
-
Step 12 - Install...
-
Step #3 - 7 Rudder...
-
Step #3 - 7 Rudder...
-
Step #11 - install...
-
Step #10 - Assy flap...
-
Step #9 - Install...
-
Step #8 - Assy...
-
Step #3 - 5- Make...
-
Step #2 - Mount...
-
Step #1 - Drill...
Avionics
- (13)
Engine
- (1)
Inspection
- (2)
Interior Finish
Lighting
- (1)
Paint / Decals
- (5)
Propeller
- (1)
Kit INVTRY
- (5)
Research
- (6)
Tools
- (1)
Workshop
- (13)
Wings
Final (X)
- (126)
FWF (X)
- (2)
Phase 1
- (2)
Builder Name:
Kyle Stone
-
Project:
Glasair - Sportsman 2+2
-
VIEW REPORTS
Total Hours:
1859.9
Start/Last Date:
Jul 03, 2019 - Jun 30, 2022
Engine:
Lycoming IO-390-EXP
Panel:
Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
Friendly URL:
https://eaabuilderslog.org?s=Sportsman
Home or Last Project Picture
Dec 13, 2020
Step #108 - Route Fuel Lines to fuel selector valve
- (4 hours)
Category: Systems (IX)
Continued to work on the fuel line routing and modifications needed for the Newton Fuel valve. I did confirm with GA that I have the correct boost pump. Brian sent me pictures of where they are currently locating the fuel selector valve (which is way far aft than the 19” described in the TWTT instructions). Some minor trimming and cutting still needed but almost done with this section. I need to order more adel clamps so I'll wait until I have them on all in to finish up the routing. Now on to the brake line install.
20201212_003.jpg
20201212_001.jpg
20201212_002.jpg
570E0D46-DAEC-4F47-ABDE-A7B586F7F544.jpeg
6E35BF4C-FF78-41DC-A476-E53739C9A57C.jpeg
80D73B92-82F5-4948-83D3-BFC1AB19C580.jpeg
9AE74CF0-FB3C-4103-9CE6-8A640FA4F28B.jpeg
A91E2FB3-201B-4BFB-8046-616933574826.jpeg
BE4FD967-0F40-417A-8334-B016F125C86D.jpeg
C5B40FFC-9350-4622-A61A-699D16B3322D.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.